Team Parks, Inc. Completes Renovation at Sandhill Cove

Monday, October 27, 2014

Team Parks recently completed a renovation of the Sandhill Cove Bistro and kitchen area consisting of demolition and complete remodel of both the dining room and kitchen areas.  The work included adding a banquet seating area to the dining room and a pass-through counter and bar from the kitchen to the pavilion room.

Jolynn Whitten, Executive Director of Sandhill Cove explains “the results of the Cove Bistro renovation exceeded our expectations in every way.  The project was completed on time with minimal disruption to our residents’ active lifestyles.  Team Parks provided close supervision of the job and the quality of the work was always a number one priority.  They were extremely responsive to our needs and special requests which led to a very high level of resident and guest satisfaction”.  Ryan Strom, President of Team Parks, adds “Sandhill Cove has been a longstanding client of ours.  It was imperative that we managed the work site in a manner causing as little disruption to the facility as possible.   We are very proud of the end result, and know this will be a welcomed upgrade for the residents and staff.”

Team Parks, a Stuart based General Contractor since 1977, provides services in general contracting, design build, construction management, tenant build-outs and green building for commercial projects along with residential new construction and renovations.  They may be reached at (772) 781-1616 or admin@teamparksinc.com.

« return